Quicklime, mainly composed of calcium oxide (CaO), has a wide range of applications in various fields such as construction, chemical engineering, metallurgy, etc. Its production is mainly achieved through high-temperature calcination of limestone.
[2025-07-01]
Quicklime, known for its high reactivity, requires careful handling during storage and transportation to ensure safety and maintain product quality.
[2025-06-27]
The control of raw material procurement costs in lime plants is crucial for overall economic benefits. Here are some effective control methods.
[2025-06-25]
China remains a global leader in lime production technology, with several manufacturers specializing in high-efficiency 100 ton per day (100TPD) lime kilns.
[2025-06-21]
Special equipment for lime kiln is the core element to ensure efficient and stable production of lime kiln, covering multiple links such as calcination, air supply, ash unloading, automatic control and environmental protection.
[2025-06-17]
China environmental protection lime kiln industry develops rapidly, and many manufacturers are committed to the research, development and application of energy conservation and environmental protection technology.
[2025-06-16]
The activity degree of quicklime is a key indicator for measuring its quality and reactivity, which reflects the speed and intensity of the reaction between quicklime and water. The following methods are commonly used to represent it.
[2025-06-04]
Lime vertical kilns have significant advantages in terms of land occupation due to their unique structure and compact layout. The vertical kiln body design enables the equipment to efficiently utilize space in the vertical direction, thereby reducing land
[2025-06-03]
Safe production is the cornerstone of sustainable development in lime plants, and it is crucial to establish a sound management system.
[2025-05-30]
The construction of a mechanical lime kiln with a daily output of 100 tons in industrial construction is an important and complex project, which usually takes about three months to complete.
[2025-05-29]