Construction period of environmentally friendly lime kiln
The construction period of environmentally friendly lime kilns is not a fixed value, it mainly depends on the construction scale and specific construction conditions of the project. Generally speaking, the complete construction period of a standard project is usually between 3 to 5 months.
For small and medium-sized lime kilns with good construction site conditions, stable geology, complete preliminary procedures, timely supply of equipment and materials, smooth connection between foundation excavation, structural construction, equipment installation and commissioning, etc., the construction period can be controlled within about 3 months. If the construction scale is large, or adverse construction conditions such as complex geology and severe weather occur, as well as possible delays in equipment delivery, the cycle will be correspondingly extended, which may take 4 to 5 months or even longer. Therefore, scientific preliminary planning and efficient on-site management are key to ensuring the project is put into operation on schedule.